Electro Industries Shark 200T Especificaciones Pagina 60

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 298
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 59
Doc# E149701 4 - 4
4: Electrical Installation
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
4.2: CT Leads Terminated to Meter
The Shark® 200 meter is designed to have current inputs wired in one of three ways.
Figure 4.1 shows the most typical connection where CT Leads are terminated to the
meter at the current gills. This connection uses nickel-plated brass studs (current
gills) with screws at each end. This connection allows the CT wires to be terminated
using either an “O” or a “U” lug. Tighten the screws with a #2 Phillips screwdriver. The
maximum installation torque is 1 Newton-Meter.
Other current connections are shown in figures 4.2 and 4.3. Voltage and RS485/KYZ
connections are shown in Figure 4.4.
Figure 4.1: CT Leads Terminated to Meter, #8 Screw for Lug Connection
Wiring Diagrams are shown in Section 4.8 of this chapter.
Communications connections are detailed in Chapter 5.
$VSSFOUHJMMT
OJDLFMQMBUFE
CSBTTTUVET
Vista de pagina 59
1 2 ... 55 56 57 58 59 60 61 62 63 64 65 ... 297 298

Comentarios a estos manuales

Sin comentarios